BUDE West "A" Home / BUDE West Project
Bude West “A” District, Phase IV South, FCT, Abuja
Land Use Analysis
Residential: 40.25%
Commercial: 14.81%
Recreational: 21.91%
Educational: 3.07%
Public Facilities: 3.65%
Circulation: 16.31%
Ecocity Developers Limited (ECADEL) was awarded the BUDE WEST “A” district within sector Q phase IV South of the FCC; it has a total land area of approximately 315 Hectares, characterized by a general flat land terrain with some rock outcrops.
With the preliminary phase (Survey works, Planning works, and Engineering Design) already completed, the project generally entails the construction of the infrastructure works of BUDE WEST “A” district according to the approved scope of works and FCDA standard conditions of contract for district infrastructure works for a period of 46 months while the comprehensive development shall be a cumulative total of 10 years. the project also includes an in-house evaluation and enumeration of features like economic trees and properties belonging to the original land powers for the purpose of compensation and settlement.